Reorder Level, Safety Stock and EOQ: Formulas With a Worked Example

Most stock-outs in a factory are not caused by a supplier failing – they are caused by a purchase order placed too late. The reorder level formula answers “when should we reorder?”, safety stock answers “how much buffer do we keep for bad days?”, and EOQ (economic order quantity) answers “how much should we order each time?”. This guide explains all three with one worked example on a raw material, adds the minimum and maximum stock levels, and shows how to run them in an ERP instead of a stores register.

The four numbers every stores team needs

The formulas

MeasureFormula
Safety stock(Maximum daily usage x maximum lead time) – (average daily usage x average lead time)
Reorder level(Average daily usage x average lead time) + safety stock
EOQ√(2 x annual demand x cost per order / holding cost per unit per year)
Maximum levelReorder level + EOQ – (minimum daily usage x minimum lead time)
Minimum levelReorder level – (average daily usage x average lead time)

Lead time means the full time from raising the requisition to accepted stock in the store – approval, PO, supplier dispatch, transit, gate entry and incoming inspection – not just the supplier’s promised delivery days.

Worked example: one raw material

Tejaxo Manufacturing (sample) uses raw material Product A. From the last six months of issues and receipts:

StepCalculationResult
Safety stock(55 x 10) – (40 x 7) = 550 – 280270 kg
Reorder level(40 x 7) + 270550 kg
EOQ√(2 x 12,000 x 1,500 / 6) = √6,000,000about 2,450 kg
Maximum level550 + 2,450 – (30 x 5)2,850 kg
Minimum level550 – 280270 kg

Reading the result: when Product A falls to 550 kg, the stores raise a requisition for about 2,450 kg – roughly five orders a year. If stock ever falls below 270 kg, the plant is eating into its safety stock and the purchase team should chase the open order. Stock above 2,850 kg means something was over-ordered or consumption has dropped.

When the formulas need adjusting

How Tejaxo ERP helps

Tejaxo ERP keeps re-order levels in the inventory module alongside stock ageing, ABC and FSN analysis, goods in transit, bin locations and physical verification. Purchase requisitions are raised manually or from MRP and flow into purchase orders with an approval workflow and delivery schedules; PRs and POs can be released from the phone, so a requisition raised at the reorder level does not wait for someone to reach a desk. Gate entry, GRN with batch-wise receipt and incoming quality complete the cycle, and the purchase reports – schedule vs actual, purchase TAT and vendor rating – give the real lead times that the formulas need. See 3-way match and GRNI for the rest of the procure-to-pay chain.

Common mistakes

Next step

Want to see re-order levels, requisitions and approvals working on your own items? Book a free consultation.

Frequently asked questions

What is the reorder level formula?

Reorder level = average daily usage x average lead time + safety stock. Without a separate safety stock figure it is often written as maximum daily usage x maximum lead time.

How do you calculate safety stock?

A simple method: (maximum daily usage x maximum lead time) – (average daily usage x average lead time). It covers days when usage is higher or delivery slower than usual.

What is EOQ?

Economic order quantity is the order size that balances ordering cost and holding cost: the square root of (2 x annual demand x cost per order / holding cost per unit per year).

What lead time should be used?

The full time from raising the requisition to accepted stock in the store, including approval, transit, gate entry and incoming inspection, measured from your own records.

How often should reorder levels be reviewed?

At least every quarter, and whenever consumption or supplier lead times change noticeably. Review A-class items more often than C-class items.

Does Tejaxo ERP support re-order levels?

Yes. Re-order levels sit in the inventory module with stock ageing and ABC / FSN analysis, and requisitions flow into purchase orders with approvals that can be released from the phone.

Stay connected

ERP insights, product updates and automation tips for manufacturers.

You have been successfully subscribed! Oops! Something went wrong, please try again.
© 2017–2026 Tejaxo Technologies Pvt. Ltd. All rights reserved. Privacy policy · Sitemap · Contact